After all, there is usually an outlet nearby to plug into. On January 11, 2018, the CPUC approved the first transportation electrification applications under SB 350 from the three large investor-owned utilities. U.S. Pat & TM Office |, RDOF Funding Updates: Insights into How the FCC is Proceeding, RDOF Funding: A Review of Auction Results and Progress, 3 Challenges of Fiber Deployment and How to Improve the Process. Inspecting, repairing and upgrading every pole in SCEs service territory is part of the work the utility does routinely. With the dominance of intermittent solar and wind, storage resources and flexiblecustomer loads will need to be managed to maintain grid stability. The Power Source Disclosure (PSD) program was established by Senate Bill (SB) 1305 (Stats. Chinese, Korean and Spanish-speaking spokespersons are available for interviews. Increasing the wind speed that poles must be designed to withstand. During five years of construction, the project resulted in many new construction jobs. 69-C), which define the need to protect utility system operations and provide guidance on overall uses of the . Modifications were made to enhance participation and performance of existing demand response programs.These programs provide incentives for commercial and industrial customers to reduce their use of electricity when the grid is stressed. One pilot will shift agricultural water pumping to off-peak times in response to price signals, while the other pilot. The reports included specific plans for Community Resource Centers, critical facilities, PSPS exercises, education and outreach-related surveys and accessibility efforts, notifications, highest risk circuits, and identified lessons learned from 2021. . After an investigation of the fire, it was found that one of the poles was 50 years old and overloaded with electrical equipment and wires. U.S. Pat & TM Office | Privacy Policy, Copyright 2023 Alden Systems, Inc., Reg. The new inspection project follows a third-party study on pole loading that found more than 75 percent of the 5,000 power poles inspected in SCEs service territory either met or exceeded the utilitys standards and exceeded requirements of the state utilities commission. So we systematically repair or replace components that are at risk of failure, along with those whose useful lives can be extended at a reasonable cost. By 2045, to meet Californias environmental goals,75% of all vehiclesin the state will needto bepowered by clean energysources. Most of SCEs poles were installed just after World War II, a time when safety factors were not separately calculated. Our permit pulling service includes the appropriate City Building and Safety Temporary Power permit, Southern California Edison and the Department of Water and Power application requirements. text: assessing the california energy crisis: how did we get to this point, and where do we go from here? Six of us dove and placed our bombs on the five 6-footdiameter penstocks that fed water to the turbines 600 feet lower at the base of the mountain. Local planners support the regulatory requirements of SCEs electrical distribution system by developing and designing plans, identifying necessary resources and providing cost estimates and options for the construction of distribution facilities. At the storm's peak late Tuesday morning, about 20,000 of SCE's 5 million business and residential customers were temporarily without power. . 3 0 obj
For captions, after clicking on the name of the briefing, click the green button below the video for captions. Southern California Edison Company . The last temporary pole we installed has a sub panel that will supply power to the construction trailer. Starting in 2014, the utility will spend $1.1 billion during the first three years of a seven-year program that will assess poles to meet not only the standards set by the California Public Utilities . POLES The minimum size of a wood pole used to support low voltage (below 1000 Volts) conductors in conformance with Article 225 of the California Electrical Code (CEC) for outdoor feeders and branch circuits shall be 6 inches by 6 inches (nominal) if square, or have a diameter of at least 5 . Staff Briefing Presentation- Liberty Utilities. Lancaster La Habra Heights. 796) in an effort to provide retail electricity consumers "accurate, reliable, and simple to understand information on the sources of energy that are used to provide electric services."1 In 2016, the California Energy Commission (Energy Commission) adopted modifications to the regulations . Generally, each home would require a sub panel installed on a pole to supply power to each home the contractor is building. Department: Power Division: Operations Wage: $88,280 - $105,935 (Depending on Experience) General Purpose: Performs . . All Rights Reserved - A-CO Temporary Power, Inc., North Hollywood, CA. Extension of temporary water and power lines to the Poultry Material Yard. They know how to work safely around power lines that are energized," he said. Raceway for temporary service shall be rigid metal conduit, electrical metal tubing or schedule 80 rigid nonmetallic conduit Identify neutral at both ends. In response to the 2017 wildfires and Senate Bill (SB) 901, we revised earlier guidelines on the de-energization of power lines and adopted the most current set of PSPS guidelines on June 24, 2021 in Decision, Bear Valley Electric Service Presentation. However, a PSPS can leave communities and essential facilities without power, which brings its own risks and hardships, particularly for vulnerable communities and individuals. Only verified, open positions at top companies. The temporary power pole set up in the picture demonstrates the option to run the wire on the ground inside conduit, solving the customers concerns about running the wire overhead and making the jobsite a safer environment. SoCalGas and SDG&E rate change - effective January 1, 2022. , but also SCEs internal, more stringent requirements. A-CO Temporary Power, Inc.Mailing Address: P.O. Faulty pool lighting and bad wiring are the greatest threats this summer, but can easily be eliminated by inspections and maintenance. It is quite an undertaking, but its something we need to do to make sure that we are delivering safe and reliable service to our customers, said Ken Trainor, SCE director of pole assessment and remediation. This effort is called a Public Safety Power Shutoff (PSPS). These include: Increasing the load weight that utility poles must support by regulating the use of stronger materials. //-->